The project covers 500.000 m3 of stone works, 17.500 m3 of concrete works, 10.000 m2 of geotextile laying work, 300.000 m3 of dredging works and 200.000 USD worth of modeling tests.
A New Port and Fishery Harbour at Wilayat Sohar
The scope covers the construction of 1070 m concrete blockwork quaywall (for a dredged depth of 16m), 850 m piled rear crane beam, 30 m transition quaywall.
Construction Of Quaywalls (phase 2) for the New Port and Fishery Harbour at Wilayat Sohar
The project covers 810 m of quaywall with 132.000 m3 of P/C Blocks, 21.000 m3 of cast-in-place concrete, 310.000 m3 of stone works and 1.600.000 m3 of reclamation works. The project is expected to be completed in 18 months.
Construction Of Bulk Liquid Berth C1 for the New Port and Fishery Harbour at Wilayat Sohar
The Contract comprises the construction of the 451 meter long Bulk Liquid Berth C1 for the New Industrial Port and Fishery Harbor at Sohar including, driving of 222 nos steel piles with diameters 1016mm, 1220 mm, 1520mm, 1370mm with lengths of 35 metres.
Constr. Of Quay Walls (phase 2a) for the New Port and Fishery Harbour at Wilayat Sohar
The Project covers the construction of 262 meters long of P/C block quay walls and berthing structures, 85 numbers of cast in-situ bored piles, 600,000 m3 dredging works, 340 meters long of landside crane rail beam, 1,160,000 ton filling works.
Fishery Harbour at Taqah
The contract covers breakwater, dredging and filling works, pontoon design and construction works.
Click to watch the video.
Construction Of New Port at Duqm
The project consists of Construction of breakwaters to create the New Port and Drydock Complex.
The project covers the construction of 2.250 m of commercial quay with minimum 18 m depth designed for containers, 680 m of quay with minimum 8m water depth, 4 km of main breakwater and 5,100 km of lee breakwater, Dredging and Reclamation works.