The project covers the construction of Guest house building, Documents Store, Bank Building, Cafeteria, Landscaping, Severage modification.
Islamabad – Turkish Embassy Buildings Construction
The Ambassador of the Republic of Turkey
Turkish Embassy- IslamabadThe cutting off the trees, boring a well for water, all kind of excavation, all kind of concrete and structural concrete, all kind of reinforcement steel, damp/water proofing at foundation, drainage at basement, backfilling.
Consruction Of 1500+700 Housing Units, Public Utilities, Conference Hall and Services, Juffra
The main scope of the project was to construct a new small town consisting of 1500 single storey and 700 multi-storey housing units complete with the necessary infrastructures, a kindergarten, primary school, shopping center, mosque.
Adana Potable Water Treatment Plant, Transmission Lines and Distribution Network
The project covers the construction of potable water treatment plant, electromechanical equipment supply, erection, construction of water reservoir, pumping station, transmission line, pumping mains, distribution network, 2 lake crossings, tunnel construction.
Construction Of Sirt Sewerage System Sirt
The project location is 400 m to the sea in Sirte and the project involves the construction of A/C and GRP Pipe Main Collectors. D/I pipe rising mains, 5 nos Pumping Station and Sewage Treatment Plant including electro-mechanical installations.
Kadincik Ii Hydroelectric Project
The project was an hydroelectric power scheme consisting of a system of dam, intake, diversion tunnel, and powerhouse put into operation on Kadıncık River located about 35 km. West of Adana-Turkey.
Benghazi Main Drainage-phase Ii
The Project comprised the works for Phase II of Benghazi Main Drainage System with 4 main collector outfalls made of reinforced concrete, twin and single box culverts.
Const. Of122 No’s Of Trenches and Channels Of Length 90 Km in the Region Of Tobruk
The project is the construction, transportation and assembly of precast units for trench places and channels. The quantity of excavation work was 250.000 cubic meters.
Water Distribution Network, Phase Ii, Makkah
The project covers the providing all material, labour, equipment and installation of a water distribution network, setting up valves, valve chambers, water hydrants, fire hydrants and water sewerage connection.
Muna Project Bulk Reservoir No.1, Roof Structure
The project covered the construction of a cable stayed reinforced concrete to shell roof, 330 m in diameter cover for approximately one million water cubic meter circular bulk storage reservoir near Al-Maarsine-Makkah.