Toilet Blocks in Muna Phase I

The contract covers the construction of 140 prefabricated (mountable-dismountable) toilet blocks serving 5020 pilgrams at the same time during the Hadj period.

Kartonsan Cardboard Factory, Izmit

The project consists of the construction of the main factory and the product storage buildings.
Building Types: Reinforced concrete buildings with structural steel roofs.

Tripoli Harbour Project No. 301, Services

The construction of a Naval Base on a Turn-key basis including design and execution of the works. The project cover the construction of Fenders for Jetties, Service Building, Surface Water Drainage and Sewage, Retaining Walls, Fencing, Concrete Pavement.

Kozyataği Housing Complex

Project consists of the construction of a large housing complex on a 24,000 m2 land near Kadıköy pine woods. There are 440 apartment flats 25 shops in 8 blocks of the housing complex. Total construction area is 72,449 m2.

Ataköy Holiday Inn Hotel, Istanbul

The project covers the construction of reinforced concrete structure of 30 storey hotel building, 105 m high from the ground level. It includes open garage, lobby, ball room, restaurant, swimming pool sport center, depot and other facilities.