The contract covers the design and construction of pavement and infrastructure works of 41km causeway, north and south berths and also ro-ro facility. The main work items of the causeway are the construction of a main bridge with 2.4km length, 5 nos of bridges each having 180m length and construction of 8 nos of precast culverts consisting of 250 nos of 5mx3mx3m segments.