The project which consisted of two sets of twin tunnels and viaducts successively, aimed to facilitate the flow of traffic around Haram during Hadj season. Tunnel 2: Dia 7.34 m. Tunnel 3 : Dia 7.34 m.and 5.70 m. Length : 2×84 m. And 162 m, 166m.