Underground Installations

The works involved the construction of underground storage tanks for fuel, water and ammunition together with access and connection tunnels.

Muna Project Tunnels 3a – 3b

The construction of two pedestrian tunnels as part of the transportation system of facilitate the pilgrimage traffic between Kaabe and Holy places during Hadj season in Makkah. The tunnels are in horse shoe section with dia 12.5m and length is 1225 m.

Muna Project Toilet Tunnels 3a, 3b, 3c in Makkah Area

The Project covered the construction of the first three Toilet Tunnels of the Muna Project, situated at both sides of the Muna Project Tunnels 3A-3B facing Kaabe to provide toilet facilities to 600 pilgrims simultaneously, especially during the Hadj Season.

Muna Project Tunnels 2a-2b

The Project covered the construction of two parallel semicircular pedestrian tunnels as part of the transportation system to facilitate the pilgrimage traffic between Kaabe and Holy Places during Hadj Season in Mecca.
The tunnels are in horse shoe section.

Muna Project Tunnels 2c – 2d

The project covered the construction of two parallel semi circular horse shoe tunnels 2×1220 m. Long and with diameter of 15,70 m. The tunnels are as part of the transportation system of facilitate the vehicular pilgrimage traffic between Kaabe and Holy.

Makkah Tunnels Leading to Haram King Gate Codai – Al Birkah

The project covered the construction of two vehicular tunnels with dia 17.70m and length 2400m and associated toilet tunnels (dia 12.50m, length 857m.) as part of the Makkah Tunnels Leading to Haram project to facilitate the traffic between Holy Places.