The piling contract comprise the manufacturing of concrete bored piles in area JBR 4 & 6 of the Jumeirah Beach Residence.
In area JBR 4 the work consists of the manufacturing of 1735 nos of Ø900-Ø1200 mm bored cast in-situ reinforced concrete piles.