In the scope of DP World Yarımca Container Terminal project below listed works are completed
successfully, Geotechnical Design of project is prepared and approvals are received From Consultant and IDV ,Trial JG Designs are carried out and JG parameters are selected , A total 14 954 nos JG columns are constructed with a total of 261.314 m Jet Grouting , Performance Load tests on Single Columns are carried out ,Multi Column Load tests are carried out on selected group of Columns, Visual checks , Rotary corings and UCS tests arecarried out at selected columns, PIT tests are executed on selected columns ,CPT tests are carried at selected zones.