The Project covers the construction of a LNG Loading Berth with 4 Nos Breasting Dolphins and 8 Nos Mooring Dolphins for 250.000 m3 LNG Carries. Lmcb Reclamation, Brekwater Extension, Berth 5 Reclamation Works.