The scope of work includes onshore /nearshore drillings, in situ testings onshore and nearshore geophysical measurements, laboratory testing and factual reporting
High Speed Highway Between Ashgabat and Turkmenbashy Site Investigation
The scope of work includes onshore drillings , in situ testings , onshore geophysical measurements, laboratory testing and geotechnical reporting
Tace Mainsite Verification And Marine Soil Investigation
ONSHORE AND NEARSHORE GEOTECHNICAL INVESTIGATION
• Drilling of 73 nos onshore and 4 nos nearshore boreholes. Conducting standard penetration tests and collecting shelby samples. Also 4 standpipe piezometers are installed in some of the boreholes to measure the groundwater level.
• Conducting 20 nos Field CBR and 7 nos Plate
Load Tests
• Performing geophysical tests including total 7 nos
seismic downhole
Urea Production Plant Stone Column Works
The scope of work includes the manufacturing of 2,500 to 3,500 nos of Ø800 mm diameter stone columns having lengths of 10-15 m.
500 Kv, 378 Km Dashkhowuz-seydi Transmission Line
Tower erection, civil works, wire stringing and commissioning works of 500 kV, 378 km Dashkhowuz-Seydi Transmission Line.
Turkmenbashi Port Development Project
The Main Port consists of three general cargo berths which presently handle salt, break – bulk, general cargo and containers, and two dry bulk berths one of which handles crushed stone and the other has been leased to an international oil company.
New Office Complex Site Project
The subsoil investigation consists of; drilling a total of 12 nos. boreholes together with Standard Penetration Tests (SPT), excavation of 17 nos. Test Pits, 1 nos. of Infiltration Tests.
Crude Oil Tank Farm Terminal Project
Accordingly the scope of the subsoil investigation consists of; drilling a total of 18 nos. boreholes together with Standard Penetration Tests (SPT), excavation of 5 nos. Test Pits, 26 nos. of Cone Penetration Tests (CPT), 2 nos. of PS Logging Tests and 8 nos. of Electrical Resistivity Tests.
Gtpogt Expansion And Modification For Gragol Deniz West Oil Development Project
The scope of the subsoil investigation consists of; drilling a total of 23 nos. boreholes together with Standard Penetration Tests (SPT), excavation of 1 no. Test Pit, 5 nos. Cone Penetration Tests
(CPT), 1 no. PS Logging Test, 2 nos Plate Load Tests, 6 nos Permeability Tests, 3 nos Piezometer
Readings on selected holes and 14 nos, 14 nos Electrical Resistivity Tests and PS Logging tests.
New Asghabat International Airport Project
The subsoil investigation report for New Ashgabat International Airport Project consists of field investigations such as borehole drillings (160nos), with standard penetration tests (SPT), permeability testing (lugeon or variable/constant head tests), pressuremeter tests, field CBR test, cone penetration tests (CPT), dynamic cone penetration tests, field vane tests, trial pits, in-situ density tests, plate loading tests, dynamic plate loading tests, seismic reflection tests, PS Logging and two dimensional electrical resistivity test.