Design, supply and installation of 1,000 tons/day capacity solid waste sorting plant in Ankara.
Project also includes the training of plant personnel, commissioning and test runs.
1350 Mw Ambarli Natural Gas Combined Cycle Power Plant; Cooling Water Intake and Outfall Structures Construction
The project scope of work included installation of 6.nos of submarine pipelines 2500 mm. İn diameter and made of reinforced concrete. The total length of the completed pipelines was 1862.6 m.
Kemerköy Thermal Power Plant, Cooling Water Intake System Construction
The Project covers the construction of trench excavation, laying of bedding material under pipes & placing the pipes on aggregate filled bags, Removing of sheet pile by underwater cutting equipment, Installation of 59 pieces of steel pipes.
Ova Natural Gas Power Plant Cooling Water Intake Facilities Construction
The project covers the design and construction of sea water intake and outfall structures. The structure is the production and installation of 2×240 m box culverts up to -27 m water depth.
Antalya Water Supply and Sanitation Project, Sea Outfall
The project covers the supply, construction and installation of high density polietilen pipes with the length of 2,472 mt on-shore, 2,600 mt off-shore 1600 mm Dia. and 315 mt diffuser portions with different size.
Marmara Ereğlisi Natural Gas Combined Cycle Power Plant and Cooling Water System Construction
The project covers the construction of 13.20 m x 12.10 m x 9.50 m reinforced concrete pump house, dredging, 100 m length production and placement of P.C. box culvert, 500 m length Ø 2800 mm P.C. pipe placement, 160 m length Ø 2000 mm steel pipe placement.
Büyükçekmece Sea Outfall, Istanbul
The project covers the construction of 1608 m long outfall with 1600 mm diameter HDPE pipe.
Water Supply to Cyprus Soğuksu Loading & Kumköy Unloading Project
Design and construction of Fresh Water Supply System to Northern Cyprus Turkish Republic.
. Soğuksu onshore pipeline Ø 560 mm HDPE, 200 m
. Soğuksu offshore pipeline Ø 560 mm HDPE, 837 m
. Kumköy offshore pipeline Ø 560 mm HDPE, 1.823 m
. Kumköy onshore pipeline Ø 600 mm GRP 2.052 m
Iskenderun Sugözü Power Plant Water Intake Structures & Sea Outfall
The project covers the construction of dredging of the 413 meter and 1.273 meter intake and discharge channels of the pipe line both on onshore and offshore, laying and leveling of the bedding material under the pipe lines, installation of Ø2800 mm and Ø2400 mm GRP pipes, manholes, diffusers.
Iskenderun Sugözü Power Plant, Mooring System
The purpose of the project is to secure the 3 vessels of the power plant and provide a safe berth against storms at Iskenderun Bay.
The project covers environmental research & design of storm mooring system, procurement and manufacturing.