The project covers the construction of dredging of the 413 meter and 1.273 meter intake and discharge channels of the pipe line both on onshore and offshore, laying and leveling of the bedding material under the pipe lines, installation of Ø2800 mm and Ø2400 mm GRP pipes, manholes, diffusers.