Assanport Off Dock-1 Container Terminal project proceeds as planned.
Izmir Light Rail Transport System Phase II Project
Izmir Light Rail Transport System Phase II Project; Project Management and Supervision Services
Kuyumcukent Workshop and Office Buildings
Kuyumcukent Workshop and Office Buildings; Project Management, Supervision and Tender Consultancy Services
Mersin International Port Projects
Project Management, Supervision and Engineering Services including Design, Design Review, Tender Consultancy, Repair and Refurbishment Engineering
DP World Yarimca Container Terminal Project
In the scope of DP World Yarımca Container Terminal project below listed works are completed
successfully, Geotechnical Design of project is prepared and approvals are received From Consultant and IDV ,Trial JG Designs are carried out and JG parameters are selected , A total 14 954 nos JG columns are constructed with a total of 261.314 m Jet Grouting , Performance Load tests on Single Columns are carried out ,Multi Column Load tests are carried out on selected group of Columns, Visual checks , Rotary corings and UCS tests arecarried out at selected columns, PIT tests are executed on selected columns ,CPT tests are carried at selected zones.
Aegean Refinery Project
TERRACE 1 – On the onshore part of the investigation site “Terrace 1”, 46 boreholes are drilled to max. 41.00 meters of depth. Furthermore, 5 nos pressuremeter tests, 8 nos permeability tests, 1 no seismic refraction, 1 no seismic reflection, 4 nos electric resistivity tests,laboratory tests are carried out and 2 nos casagrande type standpipe are installed for ground water monitoring.
TERRACE 2 – On the onshore part of the investigation site “Terrace 2”, 102 boreholes are drilled to max. 40.50 meters of depth. Furthermore, 11 nos pressuremeter tests, 8 nos permeability tests, 1 nos water pressure tests, 8 nos seismic refraction, 4 nos seismic reflection, 11 nos seismic down-hole tests and 7 nos seismic cross-hole tests, 22 nos electric resistivity tests, laboratory tests are carried out and 4 nos Casagrande type standpipe piezometers are installed ground water monitoring.
TERRACE 3 – On the onshore part of the investigation site “Terrace 3”, 60 boreholes are drilled to max. 41.00 meters of depth. Furthermore, 7 nos pressuremeter tests, 8 nos permeability tests, 3 nos seismic refraction, 3 nos seismic reflection, 4 nos seismic down-hole tests and 1 nos seismic cross-hole tests, 8 nos electric resistivity tests, 1 no thermal resistivity test , laboratory tests are carried out and 3 nos Casagrande type standpipe piezometers are installed ground water monitoring.
TERRACE 4 – On the onshore part of the investigation site “Terrace 4”, 113 boreholes are drilled to max. 40.00 meters of depth. Furthermore, 8 nos pressuremeter tests, 12 nos permeability tests, 6 nos seismic refraction, 3 nos seismic reflection, 7 nos seismic down-hole tests and 3 nos seismic cross-hole tests, 22 nos electric resistivity tests, 1 no thermal resistivity tests, laboratory tests are carried out and 6 nos casagrande type stand-pipe piezometers are installed for ground
water monitoring.
TERRACE 5 – On the onshore part of the investigation site “Terrace 5”, 70 boreholes are drilled to max. 60.00 meters of depth. Furthermore, 5 nos pressuremeter tests, 6 nos permeability tests, 10 nos seismic refraction, 4 nos seismic reflection, 1 no seismic down-hole tests and 1 no seismic cross-hole tests, 16 nos electric resistivity tests, laboratory tests are carried out and 3 nos casagrande type standpipe piezometers are installed for ground water monitoring.
TERRACE 6 – On the onshore part of the investigation site “Terrace 6”, 38 boreholes are drilled to max. 50.00 meters of depth. Furthermore, 4 nos pressuremeter tests, 7 nos permeability tests, 7 nos seismic refraction, 4 nos seismic reflection, 2 nos seismic down-hole tests, 5 nos electric resistivity tests and laboratory tests are carried out and 1 no casagrande type standpipe are installed for ground water monitoring
OFFSHORE – On the Off shore part of the investigation, 35 boreholes are drilled to
max. 83.50 meters of depth and laboratory tests are executed on
suitable samples.
PS Yard Yarımca Container Terminal Project
Accordingly the scope of the soil investigation, the fieldwork covers drilling a total of 27 nos. on shore boreholes for PS Yard Yarımca Container Project, with core or soil recovery, sampling, carriying out of in-situ test in borehole like Standart Penetration Test (SPT), and performs laboratory tests and preparation of geotechnical report.
Yarimca Container Terminal, Civil Works Contract
The project consists of the marine construction works on Yarımca Container Terminal
Click to watch video.
Rehabilitation Of Quay And Construction Of New Jetty At Zone B Of Tupras Izmit Refinery
Quay Rehabilitation, Jetty Construction, Buildings, Electrical Works, Mechanical Works, Instrumentation Works, Demolition of existing jetty and buildings
The Study on a Disaster Prevention/mitigation Basic Plan in Istanbul Including Seimic Microzonation Geotechnical & Geophysical Factual Report
Geotechnical & geophysical investigations have been carried out in both the European and Anatolian sides of İstanbul. The field work of the investigation includes drilling of 48 boreholes, execution of 40 microtremor and 39 PS Logging measurements.