Skip to content
  • Home
  • About
    • About Us
    • Financials and Annual Reports
    • Timeline
    • Vision and Strategy
    • Ethics and Values
    • Executive Management
    • Code of Conduct
  • Activities
    • Marine
      • Ports & Harbours
      • Jetties, Terminals, Quay Walls & Causeways
      • Water Intakes & Outfalls
    • Civil / Infrastructures
      • Roads
      • Bridges
      • Tunnels / Metros
      • Dams and Hydrological Projects
      • Water Treatment Plants
      • Buildings
    • Foundation and Soil Engineering
      • Grading, Compaction, Soil Remediation and Foundation Works
      • Geotechnical Investigation & Analysis
    • Engineering & Project Management
      • Planning, Design and Modelling
      • Technical Supervision and Project Management
      • Tender and Contracts Consultancy
      • Site Investigations, Condition Assessment and Refurbishment
    • Oil, Gas & Power
      • Oil & Gas Projects
      • Power Plants
      • Power Transmission Lines
  • Projects
    • Projects by Category
    • Projects by Map
    • Project Videos
  • News
  • Human Resources
    • Why STFA
      • HR Policy
      • Diversity & Equal Opportunity
    • Career
      • Professionals
      • Graduates / Internships
  • Contact Us

Portfolio Category: Tunnels / Metros

STFA Construction GroupCivil / InfrastructuresTunnels / Metros

Construction Of the Main Canal and Tunnels for Pehur High Level Canal Project

The works comprised a new tunnel to abstract water from Tarbela Reservoir and a new concrete lined canal to convey water from the tunnel outlet to the existing Upper Swat Canal System together with various appurtenant works and associated conveyance.

Pipe Laying Works Using Pipe Jacking Method Under the Motorways and Railways in General

The project covered the pipe laying works using pipe jacking method under the motorways and railways of Istanbul. The diameter of the pipes vary between 250 mm diameter to 2000 mm diameter to a total length of 1370 m.

Hüsamlar Yatağan Lignite Pit, Strip Mining Works

The project covered 20 Million m3 open cut strip mining and 9.6 million m3 coal excavation and loading works.

Ore Winding Up from Kizilsu Open Cut Copper Pit and Strip Mining Works

The project covered 1,570,000 m3 strip mining and also 285,000 tons ore winding up from Kızılsu open cut copper pit.

Design and Construction Of the Tunnels Of the Expansion Of King Khalid Bridge Until El Muayssem Road Project

The works cover the design and construction of the 2 vehicular tunnels of length 830 m, having 16 m width and 10 m height. The excavation works of the tunnels were completed in 6 months until the Hadj period for pedestrian traffic.

Extension Of King Khalid Road Tunnel No. 3-2 with Underpasses

The project covers the excavation, supporting systems, water proofing and final lining concreting for twin tube 3 lane vehicular tunnels 300m each.

Lakhdaria – Bouria Highway Tunnel

The project covers the construction of a highway twin tube tunnel of a length 2400 m including electromechanic works.

Posts navigation

← Previous 1 … 3 4

Filter Projects

  • Search

  • Project Status

SUPPLIERS / SUBCONTRACTORS

  • STFA Supply Chain Management
  • How to be a Supplier / Subcontractor

SUSTAINABILITY RESPONSIBILITY

  • Sustainable Development & CSR
  • Innovation
  • Reports / Publications

QUALITY, HEALTH, SAFETY & ENVIRONMENT

  • Quality at STFA
  • Health, Safety And Environment
  • Certificates
  • Achievements & Awards

PRIVACY AND SECURITY

  • Privacy Policy
  • Information Security Policy
  • Disclaimer

FOLLOW US

STFA Construction Group