Complete survey, supply of tower and line goods (except conductor and shieldwire), tower fabrication, erection and wire stringing works for the 45 km part of M. Ereglisi-Habibler Energy Transmission Line.
380/154 Kv Substations – 380/154 Kv Keban S/s
Complete supply, construction, modifications of 380/154 KV Substations – 380/154 KV Keban S/S – TURKEY
220 Kv, 270 Km Toskha-aswan Transmission Line
Civil, tower erection and wire stringing of 220 kV, 270 km Toskha-Aswan Transmission Line.
500 Kv, 20 Km Egypt-jordan Interconnection, Taba Connection Transmission Line
The project covers the 1,250 tons tower fabrication, civil works, erection of towers, wire stringing, commissioning and operation of 500 kV, 20 km energy transmission line in Egypt on turn key basis, which is a part of Egypt-Jordan project of energy transmission.
380/154 Kv Substations – 380/154 Kv Erzurum S/s
Complete supply, construction, modifications of 380/154 KV Substations – 380/154 KV Erzurum S/S – TURKEY
380/154 Kv Substations – 380/154 Kv Habibler S/s
Complete supply, construction, modifications of 380/154 KV Substations – 380/154 KV Habibler S/S – TURKEY
380/154/34,5 Kv Substations – 380/154/34,5 Kv Hadimköy S/s
Complete supply, construction, modifications of 380/154/34,5 KV Substations- 380/154/34,5 KV Hadimköy S/S (Itm-16B) – TURKEY
380/154 Kv Substations – 380/154 Kv özlüce S/s
Complete supply, construction, modifications of 380/154 KV Substations – 380/154 KV Özlüce S/S – TURKEY
225 Kv, 152 Km Deir Nbouh Ksara Transmission Line
Complete survey, design and manufacturing of 4500 tons tower , supply of conductor, earthwire, OPGW, insulators and hardware, civil, erection, wire stringing, performance testing. The project is on turnkey basis.
380/154/34,5 Kv Substations – 380/154/34,5 Kv Zonguldak S/s
Complete supply, construction, modifications of 380/154/34,5 KV Substations – 380/154/34,5 KV Zonguldak S/S (Itm-16B) – TURKEY