420 KV Atatürk East/West Interconnection System, substation and series capacitors banks; Temelli, Yeşilhisar S/S and Ağaçören, Göksun Scb – TURKEY
500 Kv, 378 Km Dashkhowuz-seydi Transmission Line
Tower erection, civil works, wire stringing and commissioning works of 500 kV, 378 km Dashkhowuz-Seydi Transmission Line.
154/27 Kv, 2×12.5 Mva Substation in Osmangazi, Gebze
Construction of 154/27 KV, 2×12.5 Mva Substation In Osmangazi-Gebze – TURKEY
Bağcilar District the Conversion Project from 10.5 Kv to 34.5 Kv
Bağcilar District The Conversion Project From 10.5 KV To 34.5 KV
400 Kv, 10 Km Egypt-jordan Interconnection
The project covers the 1,000 tons tower fabrication, civil works, erection of towers, wire stringing, installation works, commissioning and operation of 400 kV, 10 km energy transmission line in Jordan on turn key basis, which is a part of Egypt-Jordan.
154 Kv Substations
Complete construction/modification Of 154 KV substations – TURKEY
500 Kv Suez Canal Crossing, Egypt – Jordan Interconnection Project
Design, supply, fabrication, test and erection of 220 m height galvanised lattice steel Suez Canal Crossing towers and anchor towers, supply of conductor, OPGW, insulators and fittings, wire stringing, testing and commissioning of 500 kV energy transmission.
500 Kv, 290 Km New Suez – Taba Energy Transmission Line
The contract covers the design and test of 6 different types of towers, 16,000 tons tower fabrication, civil, erection of towers, wire stringing, OPGW ( including the supply of OPGW), commissioning and operation of 500 kV, 290 km energy transmission line.
220 Kv, 172 Km Naqab-nuweiyba Transmission Line
The project covers the civil, tower erection and wire stringing of 220 kV, 133 km Naqab-Nuweiyba Transmission Line.
220 Kv, 165 Km Quena- Safaga Transmission Line
Design and test of 7 different types of tower (including the design of 171 m high Nile River Crossing), 8,000 tons tower fabrication, civil, erection and wire stringing and commissioning works on turn key basis.