Ss-5 132 KV Conventional Substation For Habbaniya – IRAQ
Ss-5 132 Kv Conventional Substation for Yousufiya
Ss-5 132 KV Conventional Substation For Yousufiya – IRAQ
Ss-8 132 Kv Substation for Bab-al Zubair
Ss-8 132 KV Substation For Bab-Al Zubair – IRAQ
Ss-8 132 Kv Substation for Najibiya
Ss-8 132 KV Substation For Najibiya – IRAQ
Ss-5 132 Kv Conventional Substation for Old Nassiriya
Ss-5 132 KV Conventional Substation For Old Nassiriya – IRAQ
Displacement Works Of 400 Kv, 84 Km Transmission Lines on Kinali-sakarya Motorway
Survey and design of 129 OHL displacement project. 1,219 tons tower fabrication, supply of bolts and nuts, civil works, 1,219 tons erection, 84 km wire stringing and commissioning of the transmission line is within the scope of the project.
400 Kv, 611 Km Atatürk – Elbistan – Ankara Transmission Line – Turnkey Construction
The project covers the fabrication and erection of 17,032 tons tower, supply of bolts and nuts, civil works, 611 km wire stringing and commissioning of the transmission line.
2×150 Mva Kangal Termal Power Plant 380 Kv Switchyard
2×150 Mva Kangal Thermal Power Plant 380 KV Switchyard – TURKEY
154 Kv and 380 Kv Transmission Lines
The project covers the Survey, design of 16 different types of tower, 616 tons tower fabrication, supply of bolts and nuts, civil works, 616 tons erection.
30 Kv and 154 Kv Transmission Lines
This project covers the wire stringing works of 10 different Overhead Transmission Lines.