The project consists of construction of 185 m long 6 m wide approach bridge, a 20 m long 15 m width manuuever platform, a 30 m long and 15 wide loading platform, 2 nos 10 m x 10m mooring dolphins and 4 nos 10 x 10 m breasting dolphins.
Gölcük Frigate Piers Construction and Installation Works
The project involved construction of 2 nos jetties and a quay wall.

Reconstruction Of Berths 5-10 at East Wharves
Construction of 800 m of continuous piled quay wall including anchor wall, tie rods and backfill.
Reconstruction Of Dikili Port Pier
It is constructed to export granite and perlite minerals and to serve as a port for tourists during summer season. The work consists of driving of 383 no’s of Ø800 mm steel tubular piles each having a length of 35-40m.

Liquid Cargo Terminal at Port Qasim
The project covers the construction of the New petrol loading jetty contruction.

Manifa Causeway Project
The contract covers the design and construction of pavement and infrastructure works of 41km causeway, north and south berths and also ro-ro facility. The main work items of the causeway are the construction of a main bridge with 2.4km length, 5 nos of bridges each having 180m length and construction of 8 nos of precast culverts consisting of 250 nos of 5mx3mx3m segments.

Common Lean Lng Loading Facilities Berth 6
The project consists of the marine construction works on the common Lean LNG Loading Facilities at Berth 6.

Epic for Gabbro Berth Expansion (package 1) at Mesaieed Port
The project consists of Construction of breakwaters to create the New Port and Drydock Complex The scope of the project shall consist of, widening of existing channel to Gabbro Berths, deepening of existing basin at Gabbro Berths 1 and 2, dredging of new basin for new Gabbro Berth 3, construction of the 400 m long new quay wall for Gabbro Berth 3, filling and reclamation behind the quay wall, procurement, design and manufacture of Ship to Shore Cranes, construction of substation and carrying out related electrical works.

Misurata Jetty Reconstruction
Reconstruction of oil platform and installation of all machinery / equipment for operation. The extent of the mechanical, electrical and instrumentation works includes all aspects of the jetty and underground pipeline required to permit the safe unloading.

Infrastructure and Marine Works for Marincity Housing Project
The works executed under the scope of Marincity Project are; The construction and pavement works of main roads (7,500 meters long) of Marincity Housing settlement, The construction of storm water and waste water networks.