The project consists of construction Works For the New Port of Safi, Lot 1: Protection Structures, Coal Dock, Service Dock, Dredging and General Backfills.
The project consists of Construction of breakwaters to create the New Port and Drydock Complex.
The project covers the construction of 2.250 m of commercial quay with minimum 18 m depth designed for containers, 680 m of quay with minimum 8m water depth, 4 km of main breakwater and 5,100 km of lee breakwater, Dredging and Reclamation works.