The scope of work includes the geotechnical investigations along the 300 km long water supply project.
![](https://construction.stfa.com/wp-content/uploads/2014/06/JTI01w2.jpg)
The scope of work includes the geotechnical investigations along the 300 km long water supply project.
The scope of work includes the drilling of about 5,300 m and several pressure meter tests.
The scope of work includes the geotechnical investigations along the oute where the Golden Horn Bridge crossing shall be constructed. The project consists of onshore and offshore drilling and in-situ tests.
87 bored piles with dia of Ø2000mm, each having a length of 45-70m were constructed by reverse circulation drilling.
Manufacturing of Ø600mm, 800 mm, 950 mm and 1250 mm bored cast in-situ reinforced concrete piles with temporary casing with lengths varying from 16 m to 27 m. Total length of piles manufactured is 110,800 m.
The scope of work includes the manufacturing of 2,500 to 3,500 nos of Ø800 mm diameter stone columns having lengths of 10-15 m.
The piling contract comprise the manufacturing of concrete bored piles in area JBR 4 & 6 of the Jumeirah Beach Residence.
In area JBR 4 the work consists of the manufacturing of 1735 nos of Ø900-Ø1200 mm bored cast in-situ reinforced concrete piles.
The project covers the manufacturing of 514 nos of Ø450 mm , 1239 nos of Ø550mm and 381 nos of Ø600 mm diameter bored cast in-situ reinforced concrete piles. The total length of piles is 21,805 m.
The project covers the manufacturing of 2470 nos of Ø450 mm, 2625 nos of Ø550 mm, 547 nos of Ø600 mm and 154 nos of Ø 900 mm diameter bored cast in-situ reinforced concrete piles. The total length of piles is 54,497 m.
The scope of work includes the manufacturing of appr. 5,460 no’s of Ø600-800mm bored piles.