Northern Jeddah Drainage Channel Culvert Project

The Project consisting from 3 packages has a total value of 85.275.959 USD. The first package covers 2194 m. Length (3,25 m x 2,95 m) box culverts with 6 cells. The Section 2 covers 5800 m. length (3,25 m. X 2,90 m. – 3,25 m. X 4 m. ) box culverts with 3 cells. The Section 3 covers 6800 m. length (3,25 m. X 2,95 m. ) box culverts with 3 cells.

Sazlidere Dam and Associated Works

The project covers the construction of a rock fill dam on one of the creeks flowing in the Küçükçekmece Lake on the north side with a reservoir capacity of 91,300,000 cu.m together with the diversion and spillway structures.

Underground Installations

The works involved the construction of underground storage tanks for fuel, water and ammunition together with access and connection tunnels.

Muna Project Tunnels 3a – 3b

The construction of two pedestrian tunnels as part of the transportation system of facilitate the pilgrimage traffic between Kaabe and Holy places during Hadj season in Makkah. The tunnels are in horse shoe section with dia 12.5m and length is 1225 m.

Muna Project Toilet Tunnels 3a, 3b, 3c in Makkah Area

The Project covered the construction of the first three Toilet Tunnels of the Muna Project, situated at both sides of the Muna Project Tunnels 3A-3B facing Kaabe to provide toilet facilities to 600 pilgrims simultaneously, especially during the Hadj Season.

Muna Project Tunnels 2a-2b

The Project covered the construction of two parallel semicircular pedestrian tunnels as part of the transportation system to facilitate the pilgrimage traffic between Kaabe and Holy Places during Hadj Season in Mecca.
The tunnels are in horse shoe section.