The project covered the drainage lines leading to the new Shoheda Dam, construction of 7000 m. of various types of box culverts and restauration works of Al Hadj Street in accordance with the contract scope and variation orders.
Construction Of Water Transmission Main and Pumping Station in the Holy City Of Makkah, Contract-1
The project involved the construction of a 6000 m3/hr capacity pumping station, a twin water transmission main 9920 m long with 1000 mm diameter and also another 16951 m. long 1000 mm. Diameter single water transmission main.
Rainwater Collection Reservoirs in Sirt Area
Design and construction of 6 (six) reservoirs for rainwater collection in Sirt Area.
şile Caisson Wells and Darlik Derivation Project, Istanbul
Collection of both sea and river waters (and also a small amount of underground water) into 4 nos of caisson wells and transfer into a new build pump station and transfer of the water by the pumps to Darlık Dam lake through 1000 mm diameter pipes.
Istranca Rivers Kiyiköy Region Early Water Supply Project
Construction of small dams (3 nos) on the rivers flowing to the Black Sea from the Istıranca Mountains and formation of reservoirs and installation of app. 17.5 km of watermains (dia. 1800 mm steel pipes) to the Terkos lake in Istanbul.
Ormara Naval Harbour Project Water Supply System
The project covered the placing of 45 km ductile iron pipes, construction of 3 nos pump houses, 2 nos underground tanks, boosting station and miscellancous works.
Rehabilitation Of Büyüksu, Mudurnusuyu and Kuruçay Streams Flood Protection Structures
The project covered the construction of 14 nos of bridges with a total length of 352 in Büyüksu, Mudurnusuyu, Kuruçay Streams.
Atik Dam Project, Küre
The project covered the enlargement and heightening works for the Atık Dam dyke with 278,000 m3 filling material.
Seyhan Potable Water Project, Distribution Lines
The project covered the construction of CTP pipes with various diameters (400 mm – 1000 mm) and total length 45.432 m, PVC pipes with various diameters (80 mm – 300 mm) and total length 23.653 m, diameter 1200 mm alley.
Great Man-made River Project, Phase One Sirt End Reservoir
The Project covered the construction of a reservoir which has a usable storage of 6.8. million cubic meters with a water depth of 12.5 m. The Project comprised bulk excavation, earth fill, granular fill, concrete reservoir lining with geomembrane.