The project covers; 2×55000 t Caissons as Tower Foundations to be placed to a depth of -40m on seabed including dredging, driving of 390 no’s of Inclusion Piles and Bedding works, Construction of Dry Dock and Wet Dock for Caisson Production, Diaphragm Wall Construction at South Anchorage Area, Anchorage Structures positioned on both side of the Bridge, Approach Bridges Piers and Side Spans Piers for both North and South Site, Reclamation & Revetment works for the South Anchorage Area.