The project consists of two parts; civil and installation works. Civil works include construction of main building, auxiliary buildings, cable ducts, road works, equipment foundations, stack and cooling tower and water intake.

The project consists of two parts; civil and installation works. Civil works include construction of main building, auxiliary buildings, cable ducts, road works, equipment foundations, stack and cooling tower and water intake.
The project covers the Mechanical, electrical, instrumentation and erection / installations works of 100 Ton/Hr Rolling Mill facilities (Total 3,500 Tons). The project includes overhead cranes, ventilation ducts and associated piping systems.
The project covers the civil and mechanical, electrical and instrumentation erection works of 100 Ton/Hr capacity coal and coke gas tired steam boiler for power plant, including Complete civil works, Structural Steel Erection, and sheet metal claddin.
The contract covers the power distribution; design, material supply and erection of complete 154 kV switchyard, supply of unit transformers and auxiliary service transformers.
The contract includes design, engineering, civil construction, supply, fabrication, mechanical /electrical/ instruments installation and commissioning of a Naphtha Merox Plant with 66 m3/hour capacity.
The turnkey contract includes design, engineering, civil construction, supply, fabrication, mechanical, electrical / instruments installation and commissioning of a 66 m3/hour capacity Kerosene Merox Plant.
The project covers the Pipe installation between existing refinery units and new Hydrocracker Unit.
Construction of 212 km Bursa-Çan natural gas pipeline of which 74 km of 24″, 30 km of 16″, 105 km of 12″ and 3 km of 8″ diameter pipes. The project also consists of the supply, construction and erection of 4 pigging stations and 2 regulating and metering.
Survey, planning, design, material supply, construction, hydro-testing and commissioning of 301 km, 48 inch diameter natural gas pipeline on turnkey basis. The project includes SCADA, cathodic protection and allied facilities.
The project covers the Survey, construction and commissioning of 63 km, 36 ich11.1 mm spiral welded steel pipeline. The line pipes are externally extruded polyethylene coated.