154/34.5kV 25 Mva Transformer Substation, Göksun, Kahramanmaraş – TURKEY
400 Kv, 332 Km Sincan-temelli-tepeören Transmission Line
Survey, design of 6 different types of tower, 9091 tons tower fabrication, supply of bolts and nuts, civil works, 9091 tons erection, 322 km wire stringing and commissioning of the transmission line.
Iskenderun-divriği Railway Electrification, Iskenderun
Iskenderun-Divriği Electrification Project covers changing of the current railways, which is 577 kms long, to the electric railway in order to accelerate the intensive train traffic caused by the mine transportation through this route.
111 K 154/6.3 Kv 2×20 Mva Transformer Substations Of Liquidated Natural Gas Import Terminal Materials
111 K 154/6.3 KV 2×20 Mva Transformer Substations of Liquidated Natural Gas Import Terminal Materials – TURKEY
Electrification and Lighting Works Of Kazanci – Gümüşova Motorway
As a member of STFA Tektes-Turk Philips Consortium, STFA Tektes scope of work mainly consist of design, supply, erection, test, commissioning and one year maintenance of Kazanci-Gumusova Motorway electrification and lighting works.
400 Kv, 366 Km Göksun-temelli Transmission Line
The project covers the fabrication of 3,076 ton tower, supply of bolts and nuts, civil works, 5,953 ton erection, 366 km wire stringing and commissioning of the transmission line.
154 Kv, 69 Km 7 Different Transmission Lines
Survey, material supply, 1,370 tons tower fabrication and erection and wire stringing works of 154 kV, 69 km energy transmission lines at 7 different districts of Turkey.
380 Kv, 96 Km Seydişehir-konya Transmission Line
The project covers the 2,200 tons of tower fabrication and erection, wire stringing works of 380 kV, 96 km Seydisehir-Konya Transmission Line.
420 Kv Atatürk East/ West Interconnection System, Substations and Series Capacitors Banks; Temelli, Yeşilhisar S/s and Ağaçören, Göksun Scb
420 KV Atatürk East/West Interconnection System, substation and series capacitors banks; Temelli, Yeşilhisar S/S and Ağaçören, Göksun Scb – TURKEY
154/27 Kv, 2×12.5 Mva Substation in Osmangazi, Gebze
Construction of 154/27 KV, 2×12.5 Mva Substation In Osmangazi-Gebze – TURKEY