The project covers the fabrication and erection of 755 numbers of towers, 245 km wire stringing and commissioning of the transmission line.
400 Kv, 220 Km Atatürk-gaziantep-erzin Transmission Line
The project covers the fabrication and erection of 5,795 tons tower, civil works, 221 km wire stringing and commissioning of the transmission line.
380 Kv, 221 Km Atatürk-gaziantep-erzin Transmission Line
The project covers the fabrication and erection of 546 numbers of towers, 221 km wire stringing and commissioning of the transmission line.
Displacement Works Of 400 Kv, 84 Km Transmission Lines on Kinali-sakarya Motorway
Survey and design of 129 OHL displacement project. 1,219 tons tower fabrication, supply of bolts and nuts, civil works, 1,219 tons erection, 84 km wire stringing and commissioning of the transmission line is within the scope of the project.
400 Kv, 611 Km Atatürk – Elbistan – Ankara Transmission Line – Turnkey Construction
The project covers the fabrication and erection of 17,032 tons tower, supply of bolts and nuts, civil works, 611 km wire stringing and commissioning of the transmission line.
2×150 Mva Kangal Termal Power Plant 380 Kv Switchyard
2×150 Mva Kangal Thermal Power Plant 380 KV Switchyard – TURKEY
154 Kv and 380 Kv Transmission Lines
The project covers the Survey, design of 16 different types of tower, 616 tons tower fabrication, supply of bolts and nuts, civil works, 616 tons erection.
30 Kv and 154 Kv Transmission Lines
This project covers the wire stringing works of 10 different Overhead Transmission Lines.
154/34.5kv 25 Mva Transformer Substation, şarkişla, Sivas
154/34.5kV 25 Mva Transformer Substation, Şarkişla Sivas – TURKEY
154/34.5 Kv 25 Mva Transformers Substations Adilcevaz, Bitlis
154/34.5 KV 25 Mva Transformer Substation Adilcevaz-Bitlis – TURKEY