Marmaray Bosphorus Tube Crossing, Istanbul

The project covers the geotechnical investigations on both the Anatolian side and European side of Istanbul. The project consists of 109 boreholes of depth upto 101 metres a total of 3900 metres drilling. Additional to boreholes also PS logging tests.

Cekmeköy Housing Project Shoring Works

The scope of work comprises the design and the construct of a shoring system, together with all related temporary works. The excavation extends to a depth of 18-19 m. below existing ground level.