Foca Hacilar Harbour Stage I and Stage Ii

The project covers the construction of 1850 m long concrete block quays, finger piers for L.S.T. and coaster ships and area works as well as electrical installations.

Alsancak Harbour Construction, Phase I

The scope of the works involved the construction of ferry boat and cargo ships on R.C. Piles, breakwaters and shore protection works. The length of the reubble mound breakwater is 1650m.
The length of the piled quay is 150m.

Taşucu Breakwater

The scope of the Project is the construction of main and secondary breakwaters for the habrour of paper factory at Tasucu near Mersin, Turkey.

Marmaray Cr-3 Project- Asia & European Side

ASIA SIDE
The summary of executed geotechnical investigations is as follows, drilling of a total of 30 nos. boreholes with core/soil recovery, sampling, carrying out of in-situ test in borehole like Standard Penetration Test (SPT), and performing of laboratory tests and preparation of factual report.

EUROPEAN SIDE
The summary of executed geotechnical investigations is as follows, drilling of a total of 7 nos. boreholes with core/soil recovery, sampling, carrying out of in-situ test in borehole like Standard Penetration Test (SPT), and performing of laboratory tests and preparation of factual report.

Mersin Akkuyu Nukleer Power Plant Nearshore & Onshore Soil Investigation Project

A total of 70 nos onshore boreholes are drilled up
to 70 m depths and total onshore drilling is
2368.5 m.
Acker Renagade and Diamec 262 type drill rigs are
utilized for Onshore boreholes.
A total of 101 nos boreholes drilled up to 30 m
depths from sea bed bottom, geophysical and
pressuremeter tests are executed at selected
boreholes.Total nearshore drilling is 2434.50 m.
At Nearshore boreholes,
1. Ergun Hoca Jack Up,
2. İsmail Hakkı Jack Up,
3. Galata Barge Platform
4. Catamaran Type Gölcük Barge
5. Platforms are utilized.

Izmit Bay Suspension Bridge Project

Drilling a total of 22 nos boreles and execution of, standart penetration tests (SPT), laboratory testing and geotechnical reporting. At project site, onshore topographical surveys and bathymetrical surveys are executed at selected locations.

Kabataş Jetty And Surroundings Regulation Project

8 nos onshore boreholes drilled up to maximum
36.00 m. Depths, 6 nos seismic refraction, 4 nos
electrical resistivity measurements were executed
and laboratory tests were carried out on selected samples.
6 nos nearshore boreholes were drilled
(maximum depth 42.50m) and laboratory tests
were carried out on selected samples and
geotechnical report is prepared.