Rota Cement Factory Quay Piling Works

The project covers a 126.7 m long, 15.75 m wide berth construction on 144 nos 55×55 cm precast concrete piles and a 5,52 m long 5.06 m wide platform constructed on 4 nos of 55 x 55 cm precast concrete piles.

Marmara Terminal Ship Berthing Facility

The workmanship contract is the construction of ship berthing facilities and has two phases. The first phase covers the construction of a jetty 290 m. Long and 160 m wide. The water depth is 12 m and the jetty has been designed for 15,000 DWT ships.

Adana Gölovasi Jetty

The project covers the workmanship of the piled jetty construction together with concrete works and shore protection.

Gemlik Jetty Construction

The project consists of driving of 595 no’s steel tubular piles each having a length of L=50-65 m. The jetty has an area of 10,000m2. 16,500 m3 of concrete and 2,400 tons of reinforcement was used during the construction.

Construction of Substructures and Caissons of Izmit Bay Suspension Bridge

The project covers; 2×55000 t Caissons as Tower Foundations to be placed to a depth of -40m on seabed including dredging, driving of 390 no’s of Inclusion Piles and Bedding works, Construction of Dry Dock and Wet Dock for Caisson Production, Diaphragm Wall Construction at South Anchorage Area, Anchorage Structures positioned on both side of the Bridge, Approach Bridges Piers and Side Spans Piers for both North and South Site, Reclamation & Revetment works for the South Anchorage Area.

Click to watch video.

Caissons for the İzmit Bay Crossing Project

Kuşadasi Yacht Harbour

The construction of a yacth harbour consisting of main and secondary breakwaters, quays and finger piers.