Bağfaş Bandirma Fertilizer Factory

The project covers the construction of dolphin and acid platform, quay reinforcing tampon, piling works for 20.000 tons phosphoric acid tanks and Quay for 1000 tons motors near acid tank base.

Mersin Sea Entrance

The project consists of construction of 185 m long 6 m wide approach bridge, a 20 m long 15 m width manuuever platform, a 30 m long and 15 wide loading platform, 2 nos 10 m x 10m mooring dolphins and 4 nos 10 x 10 m breasting dolphins.

Reconstruction Of Dikili Port Pier

It is constructed to export granite and perlite minerals and to serve as a port for tourists during summer season. The work consists of driving of 383 no’s of Ø800 mm steel tubular piles each having a length of 35-40m.

Additional Extension Of Hereke

The scope of work includes the construction of an additional 145 m long and consisted of Quarry with steel piles and 133+12=145 m length, 49.50m wide steel pipe pier.