The project covers the construction of dolphin and acid platform, quay reinforcing tampon, piling works for 20.000 tons phosphoric acid tanks and Quay for 1000 tons motors near acid tank base.
Pendik Shipyard Gantry Crane Runway and Jib Crane Runway Extension
Crane runway beams supported by R.C. piles. The scope covered 2 Nos 450 m. R.C. beams for 300 tons gantry crane and one 150 m. R.C. beam for JIB crane.
Construction Of Lng Import Terminal, Marmara Ereglisi
The project consists of the Construction of Liquified Natural Gas Terminal having, LNG Storage Tanks, process piping system, pipeline, land reclamation, shore protection and jetty construction.
Mersin Sea Entrance
The project consists of construction of 185 m long 6 m wide approach bridge, a 20 m long 15 m width manuuever platform, a 30 m long and 15 wide loading platform, 2 nos 10 m x 10m mooring dolphins and 4 nos 10 x 10 m breasting dolphins.
Gölcük Frigate Piers Construction and Installation Works
The project involved construction of 2 nos jetties and a quay wall.
Reconstruction Of Dikili Port Pier
It is constructed to export granite and perlite minerals and to serve as a port for tourists during summer season. The work consists of driving of 383 no’s of Ø800 mm steel tubular piles each having a length of 35-40m.
Infrastructure and Marine Works for Marincity Housing Project
The works executed under the scope of Marincity Project are; The construction and pavement works of main roads (7,500 meters long) of Marincity Housing settlement, The construction of storm water and waste water networks.
Belde Port Facilities 1st Part Quay Construction, Coastal Fill and Protection Works
The scope of the project is the construction of the first part of the quay of a container port which is 450 meters long in Dilovası District, between Gebze-Izmit Province in Marmara Region.
Extension Of Hereke Port Hereke
The scope of work includes the construction of a 198 m long and 60 m wide steel pipe pier.
Additional Extension Of Hereke
The scope of work includes the construction of an additional 145 m long and consisted of Quarry with steel piles and 133+12=145 m length, 49.50m wide steel pipe pier.