The project covered 1,570,000 m3 strip mining and also 285,000 tons ore winding up from Kızılsu open cut copper pit.
Construction Of Kömürhan Highway and Tohma Combined Highway-railway Bridges
The Project covered the construction of two R.C. Bridges on the rivers of Euphrates and Tohma.
The project involved the construction of the 287 m. long Komurhan highway bridge across the euphrates river between Malatya and Elazığ.
Kinali-Edirne Motorway, Structure Construction Sub-contract
Construction of all viaducts (13 Nos), bridge across rivers (21 Nos), overpasses (60 Nos) and underpasses (11 Nos) on the Kınalı-Edirne Motorway.
Yeşilçay System ömerli
The scope covers the manufacturing of 20 nos of Ø1750mm diameter piles with depths up to 47 metres. The length of the aqueduct is 225.4 m with a width of 12.5 m, consisting of 9 axis having a distance of 25 m between two axis (piers).
Yeşilçay System Darlik Pipeline Aqueduct Construction, Istanbul
The scope covers the construction of 12 nos of Ø1750mm diameter piles with pile lengths up to 36 metres. The length of the aqueduct is 125 m with a width of 12.5 m, consisting of 6 axis having a distance of 25 m between two axis (piers).
Construction Of New Galata Bridge and Re-arrangement Of Eminönü and Karaköy Squares at Golden Horn
The project covered the construction of a 490 m. Long and 42 m. Wide bridge supported by tubular steel piles. The project also covered the rearrangement of Eminonü and Karaköy squares at each end of the bridge.
Birecik Dam Project
In order to assess the ground and hydrological situation in vicinity of the Birecik Dam foundation an extensive site investigation program had to be performed.
STRABAG-GAMA-PHILIPP HOLZMANN
Kinali-Sakarya Highway (including Second Bosphorus Bridge)
The contract consisted of four lots including construction of a suspension bridge having 1090 m main span between two towers having 105 m height. Deck of the bridge is 39 meters wide and is at 64 meters from sea level. Total length of the roads is 220 km.
ümraniye-altunizade Motorway, Istanbul
Construction of 5263 m long 2×2 motorway between Ümraniye-Altunizade connecting the first and the second ring roads, 9217 m long 1×2 side roads, miscellaneous ancillary roads and junction roads.
First Stage Of Istanbul Sewerage Project Ahirkapi Sea Outfalls
The project covers the construction of two parallel, 1162 m. long sea discharge pipelines and their associated connection works with an inland collector system.