The project was an hydroelectric power scheme consisting of a system of dam, intake, diversion tunnel, and powerhouse put into operation on Kadıncık River located about 35 km. West of Adana-Turkey.
şile Caisson Wells and Darlik Derivation Project, Istanbul
Collection of both sea and river waters (and also a small amount of underground water) into 4 nos of caisson wells and transfer into a new build pump station and transfer of the water by the pumps to Darlık Dam lake through 1000 mm diameter pipes.
Istranca Rivers Kiyiköy Region Early Water Supply Project
Construction of small dams (3 nos) on the rivers flowing to the Black Sea from the Istıranca Mountains and formation of reservoirs and installation of app. 17.5 km of watermains (dia. 1800 mm steel pipes) to the Terkos lake in Istanbul.
Rehabilitation Of Büyüksu, Mudurnusuyu and Kuruçay Streams Flood Protection Structures
The project covered the construction of 14 nos of bridges with a total length of 352 in Büyüksu, Mudurnusuyu, Kuruçay Streams.
Atik Dam Project, Küre
The project covered the enlargement and heightening works for the Atık Dam dyke with 278,000 m3 filling material.
Seyhan Potable Water Project, Distribution Lines
The project covered the construction of CTP pipes with various diameters (400 mm – 1000 mm) and total length 45.432 m, PVC pipes with various diameters (80 mm – 300 mm) and total length 23.653 m, diameter 1200 mm alley.
Sazlidere Dam and Associated Works
The project covers the construction of a rock fill dam on one of the creeks flowing in the Küçükçekmece Lake on the north side with a reservoir capacity of 91,300,000 cu.m together with the diversion and spillway structures.
First Stage Of Istanbul Sewerage Project, Construction Of Fatih, Haliç and Eyüp Tunnels
The project covered the boring of 3 tunnels on the South West side of Golden Horn at Eyüp, Haliç and Fatih 1858 m, 2648 m, and 1877 m long respectively, 2 nos. of deep shaft constructions, construction of 19 manhole chambers, 1122 m R.C. piping.
First Stage Of Istanbul Sewerage Project, North Golden Horn Collectors
The project comprised boring of 3 main and branch tunnels, installation of R.C. Pipes in open cut trenches and connection of branch collectors. All tunnels and pipes were PVC lined. The diameters of the tunnels vary from 1800 mm to 3200 mm.
Istanbul Sewerage Project Caddebostan – Fenerbahçe Interceptors
The Project covers the cleaning, discharging, lightening and ventilation of existing pipeline of 2132 m in length.The reinstallation of box and pipes, trench excavation, installation and testing of 652 m long R.C. pipeline with diameter 3600 mm.