The project consists of manufacturing and driving of prefabricated 45cm x 45cm piles at the precast yard, execution of Æ1500mm, L=64m and, Æ2000mm, L=81m cast in-situ piles, installation of vertical drains, driving and extraction of sheet piles.
The Project covers two main parts in which the first part covers the construction of 525 mt long quay consisting of 3000 t. caissons at sections 9 and 10 of the port area, and the second part the construction of a landing pier for service vehicles.