Complete survey, design and manufacturing of 4500 tons tower , supply of conductor, earthwire, OPGW, insulators and hardware, civil, erection, wire stringing, performance testing. The project is on turnkey basis.
Coastal Area Wastewater Project, Construction Of Sea Outfall
The project comprised of the construction of a 900 mm diameter 1860 m long concrete coated steel pipe sea outfall with a 288 m long diffuser section in nominal bores varying from 900 mm to 500 mm. The pipes will be laid upto 26 m deep seabed.