Poti Expansion Project

Project includes reconstruction of existing breakwater, preliminary test piles, detailed design & modelling, etc…

Koromkhetı Hydropower Project

Field work comprised of 32 nos boreholes, Performing hand vane test in test pit or trench 44 Nos Performing rising head permeability test 8 Nos Performing constant head permeability test 30 Nos Performing single packer water pressure test 35 Nos and performs laboratory tests and preparation of geotechnical report.

Adjaristsqali Cascade Hydropower Project

Drilling a total of 22 nos boreles up to maximum 100m depths, rotex type drilling with DTH, in situ testing, rising head, constant head permeability testing, water pressure testings, detailed rock logging, in situ laboratory testing, factual reporting.