Design, Supply of Material & Equipment and Installation Supervision Of 6 Nos. 132/33/11 KV Substations. (Ref.No. Ss-7/2000) – IRAQ.
Sazlidere Dam Energy Transmission Lines and Pumping Stations
Design, supply, erection and commissioning of 12 km. 34.5 kV, 2x3x477 MCM overhead power transmission lines.

Const. Of 200 Kv 327 Km Double Circuit Double Phase Overhead Energy Transmission Line
The project covers the construction of 327 km+49 km(%15) km 220 Kv, Double Circuit, OH Energy Transmission Line from GMMRA-2 SS to GMMRA-1 to SEPHA 18TH km.