Project includes reconstruction of existing breakwater, preliminary test piles, detailed design & modelling, etc…

Project includes reconstruction of existing breakwater, preliminary test piles, detailed design & modelling, etc…
The project covers marine works such as breakwater, quay, dredging works and soil improvement.
Click to watch the video.
STFA Nador Port Morocco
The contract covers breakwater, dredging and filling works, pontoon design and construction works.
Click to watch the video.
The construction of a harbour comprising main and secondary breakwaters, a loading – unloading berth and a multipurpose wharf.
The project covers the construction of harbour and underground submarine shelters at the Blacksea coast – Turkey
The construction of a yacth harbour consisting of main and secondary breakwaters, quays and finger piers.
The project involved the construction of a military harbour at Tobruk. The harbour perimeter was constructed of sheet pile and concrete block quays and it was protected by a sheet piled pier and breakwater.
The contract was the first stage construction of Tripoli Harbour development scheme comprising the construction of a breakwaters, quaywalls, slipway, reclamation of this area by dredging and construction of superstructures on this reclaimed area.
The project involved the construction of breakwaters and a system of quay and finger piers to accomodate naval vessels.
The project covers the construction of 1850 m long concrete block quays, finger piers for L.S.T. and coaster ships and area works as well as electrical installations.