Tripoli Marina

The contract comprises the construction of Yacht Marina in Tripoli. The works comprise breakwaters, quay wall, piled piers and outdoor lightening.

Port Development for the Misurata Steel Complex

A port development project to serve the Misurata Steel Complex to be established in the town of Misurata located at 210 km. East of Tripoli, Libya. The scope covers the onstruction of breakwaters, bulk berth, small craft harbour, dredging and reclamation.

Turkmenbashi Port Development Project

The Main Port consists of three general cargo berths which presently handle salt, break – bulk, general cargo and containers, and two dry bulk berths one of which handles crushed stone and the other has been leased to an international oil company.

Brega Industrial Commercial Port Maintenance Project

The project consists of the demolishing and reconstruction of the Breakwater upper structure (700 m in length) and the loading quay for Napth, Urea, Ammonia and Methanol which is still in use of Sirte Oil Company, and other repair works.

Dareen Port Expansion Project

Breakwater, extension of the existing service dock, pontoon construction, various building and infrastructure works are within the scope of the project.