The project consists of the construction of a jetty for the transportation of 18 ton concrete pipe units. The pipes were fabricated in Tuzla D.S.I. concrete pipe plant and destined for Istanbul water supply project.
Jetty for Petrochemical Complex, Yarimca
The project consisted of a RC 270m. Long jetty to unload petrochemical materials for Petrochemical Complex at
Yarımca – Turkey
Yanbu Ras-baradi Oil and Cement Jetty
The construction of a jetty to unload oil and cement tankers for cement factory site. The works consisted of a main platform, mooring and breasting dolphins and a causeway connecting the main platform to shore.
çanakkale Cement Factory Jetty
The Project involves the construction of 200 meter long concrete block quay and a piled jetty to accomodate 30.000 DWT vessels and ferry boats including loading – unloading installations. The contract was on turnkey basis including design and construction.
Tobruk Jetties
The works comprise the construction of several jetties for fishery and military purposes. The jetties are composed of a rubble mound approach protected with rock armouring and tetrapods, and a berthing length formed of precast reinforced concrete.
Bağfaş Bandirma Fertilizer Factory
The project covers the construction of dolphin and acid platform, quay reinforcing tampon, piling works for 20.000 tons phosphoric acid tanks and Quay for 1000 tons motors near acid tank base.
Naval Base Construction
The construction of naval base on a turn-key basis including design and execution of rock protection bunds, quays, jetties, structural steel buildings, dredging and reclamation.
Pendik Shipyard Gantry Crane Runway and Jib Crane Runway Extension
Crane runway beams supported by R.C. piles. The scope covered 2 Nos 450 m. R.C. beams for 300 tons gantry crane and one 150 m. R.C. beam for JIB crane.
Construction Of Quay No 9 and 10, Service Berth and Pavement for Quay No:8, Port Of Gabes
The Project covers two main parts in which the first part covers the construction of 525 mt long quay consisting of 3000 t. caissons at sections 9 and 10 of the port area, and the second part the construction of a landing pier for service vehicles.
Construction Of Lng Import Terminal, Marmara Ereglisi
The project consists of the Construction of Liquified Natural Gas Terminal having, LNG Storage Tanks, process piping system, pipeline, land reclamation, shore protection and jetty construction.