Project includes reconstruction of existing breakwater, preliminary test piles, detailed design & modelling, etc…

Project includes reconstruction of existing breakwater, preliminary test piles, detailed design & modelling, etc…
Assanport Off Dock-1 Container Terminal project proceeds as planned.
The project covers marine works such as breakwater, quay, dredging works and soil improvement.
Click to watch the video.
STFA Nador Port Morocco
Click to watch the video.
The project consists of the marine construction works on Yarımca Container Terminal
Click to watch video.
Quay Rehabilitation, Jetty Construction, Buildings, Electrical Works, Mechanical Works, Instrumentation Works, Demolition of existing jetty and buildings
The contract covers breakwater, dredging and filling works, pontoon design and construction works.
Click to watch the video.
The project covers the construction of two parallel, 1162 m. long sea discharge pipelines and their associated connection works with an inland collector system.
Design, supply and installation of 1,000 tons/day capacity solid waste sorting plant in Ankara.
Project also includes the training of plant personnel, commissioning and test runs.