Gecol Fast Track Simple Cycle Power Plant Project

The objective of this investigation was to determine the onshore subsoil conditions at the site for various building components, so as, to provide information related to the evaluation of the
subsurface conditions. The number, locations and depth of boreholes are decided to obtain satisfactory information about the subsoil conditions.
The summary of executed geotechnical investigations are as follows,

– Drilling a total of 7 nos boreholes such as
– Standard Penetration Test (SPT),
– 4 nos Trial Pits,
– Installation of 3 nos standpipe for ground water monitoring.

Medina Tower Project

Subsoil investigations have been carried out at Medina Tower project site according to the technical specifications received from Owner and supervision of Architect  and Civil Works Contractor during  field and laboratory works.

Mersin Akkuyu Nukleer Power Plant Nearshore & Onshore Soil Investigation Project

A total of 70 nos onshore boreholes are drilled up
to 70 m depths and total onshore drilling is
2368.5 m.
Acker Renagade and Diamec 262 type drill rigs are
utilized for Onshore boreholes.
A total of 101 nos boreholes drilled up to 30 m
depths from sea bed bottom, geophysical and
pressuremeter tests are executed at selected
boreholes.Total nearshore drilling is 2434.50 m.
At Nearshore boreholes,
1. Ergun Hoca Jack Up,
2. İsmail Hakkı Jack Up,
3. Galata Barge Platform
4. Catamaran Type Gölcük Barge
5. Platforms are utilized.

Petrofac South Yoloten Gas Field Development Project

The South Yoloten Gas Field Development Project is a new facility being developed in the aforesaid region. The proposed facility consists of Central Processing Facilities (CPF), Gas Treatments Units, Gas Export Pipeline and many other units and facilities. NCC is awarded with the contract for construction of the 10kV OHL from CPF 1 to Shatlyk Compression Station along the Gas Export Pipeline, which was subjected to this geotechnical investigation.

Izmit Bay Suspension Bridge Project

Drilling a total of 22 nos boreles and execution of, standart penetration tests (SPT), laboratory testing and geotechnical reporting. At project site, onshore topographical surveys and bathymetrical surveys are executed at selected locations.

Adjaristsqali Cascade Hydropower Project

Drilling a total of 22 nos boreles up to maximum 100m depths, rotex type drilling with DTH, in situ testing, rising head, constant head permeability testing, water pressure testings, detailed rock logging, in situ laboratory testing, factual reporting.

Karachi Port Qasim Lng Terminal Site

OFFSHORE GEOTECHNICAL INVESTIGATION
Drilling a total of 5 nos boreholes at Jetty Area and
19 nos boreholes along pipeline and execution of,
Standart penetration tests (SPT),laboratory testing
and geotechnical reporting.
ONSHORE GEOTECHNICAL INVESTIGATION
Drilling a total of 2 nos boreholes and execution of
Standart penetration tests (SPT), and laboratory
testing and geotechnical reporting.
HYDROGRAPHICAL,GEOPHYSICAL,
OCEANOGRAPHIC and OTHER SURVEYS
At projec site, following surveys are executed;
• 265 km bathymetrical surveying
• 75 km Subbottom profiling
• 60 km Side Scan Sonar measurements
• CTD measurements at 12 nos locations,
• Current and Tidal Measurements at 2 nos
locations for 3 months period
• Seismic Hazard Asssetment Report
• Inventory Study to Met Ocean Conditions

Kabataş Jetty And Surroundings Regulation Project

8 nos onshore boreholes drilled up to maximum
36.00 m. Depths, 6 nos seismic refraction, 4 nos
electrical resistivity measurements were executed
and laboratory tests were carried out on selected samples.
6 nos nearshore boreholes were drilled
(maximum depth 42.50m) and laboratory tests
were carried out on selected samples and
geotechnical report is prepared.