67 boreholes with max. Depths up to 40m, 31 nos of testpits were executed along the pipeline route, PRMS and 103A compressor station sites.

67 boreholes with max. Depths up to 40m, 31 nos of testpits were executed along the pipeline route, PRMS and 103A compressor station sites.
The purpose of the project was to design and install a water conveyance pipeline system, in order to serve the coastal area agricultural projects, to the west and south west of Tripoli.
The scope of work includes the geotechnical investigations for the Greater İStanbul Water Supply Project. The Melen Project is a large water supply project for Istanbul.
The objective of this investigation was to determine the subsoil conditions at the site, so as, to provide information related to the evaluation of the subsurface conditions. Onshore investigation consisted total of 29 boreholes with a maximum depth of 35m.
Al Kufra to Tazerbo Conveyance Pipeline conveys water pumped from Al Kufra wells in the south -eastern region of Libya to the coastal strip to supply agricultural, municipal and industrial water needs.
The project covers the geotechnical investigations on both the Anatolian side and European side of Istanbul. The project consists of 109 boreholes of depth upto 101 metres a total of 3900 metres drilling. Additional to boreholes also PS logging tests.
The project covers the geotechnical investigations for the 50 km long onshore pipeline, navigational channel, onshore gas terminal and fabrication yard.
The scope of work covers the geotechnical investigatins along the 622 km long proposed pipeline route.
The scope of work includes the geotechnical investigations along the 300 km long water supply project.
The scope of work includes the drilling of about 5,300 m and several pressure meter tests.