Geotechnical & geophysical investigations have been carried out in both the European and Anatolian sides of İstanbul. The field work of the investigation includes drilling of 48 boreholes, execution of 40 microtremor and 39 PS Logging measurements.
Port Of Bourgas Expansion Project Offshore Geotechnical Investigations
This work has been carried out in order to determine the soil conditions of Bourgas Port, Basin Area, Wharf Foundation, Reclamation Area and Breakwater Foundation. A total of 48 boreholes were drilled. 15 boreholes on the Basin Area.
Gas Transmission Pipeline to Coastal Network Geotecnical Investigations
67 boreholes with max. Depths up to 40m, 31 nos of testpits were executed along the pipeline route, PRMS and 103A compressor station sites.
Tripoli Tee to Bir Tirfas Conveyance Line and Water Storage Tanks Geotechnical Factual Report
The purpose of the project was to design and install a water conveyance pipeline system, in order to serve the coastal area agricultural projects, to the west and south west of Tripoli.
Greater Istanbul Water Supply Project, Phase 1+2
The scope of work includes the geotechnical investigations for the Greater İStanbul Water Supply Project. The Melen Project is a large water supply project for Istanbul.
Eni Gas B.v., Libyan Branch, Western Libya Gas Project, Supply Base and Tugboat Harbour Geotechnical
The objective of this investigation was to determine the subsoil conditions at the site, so as, to provide information related to the evaluation of the subsurface conditions. Onshore investigation consisted total of 29 boreholes with a maximum depth of 35m.
Great Man Made River Project, Phase 3, Al Kufra Wellfield to Tazerbo Conveyance Pipeline & Phase 3 Pump Stations
Al Kufra to Tazerbo Conveyance Pipeline conveys water pumped from Al Kufra wells in the south -eastern region of Libya to the coastal strip to supply agricultural, municipal and industrial water needs.
Marmaray Bosphorus Tube Crossing, Istanbul
The project covers the geotechnical investigations on both the Anatolian side and European side of Istanbul. The project consists of 109 boreholes of depth upto 101 metres a total of 3900 metres drilling. Additional to boreholes also PS logging tests.
Petronas Carigali Turkmenistan Block 1 Feed Study Geotechnical Investigations
The project covers the geotechnical investigations for the 50 km long onshore pipeline, navigational channel, onshore gas terminal and fabrication yard.
Gmmr Project Phase4 Ghademes-zwara Water System Geotechnical Investigations
The scope of work covers the geotechnical investigatins along the 622 km long proposed pipeline route.