Marmaray Bosphorus Tube Crossing, Istanbul

The project covers the geotechnical investigations on both the Anatolian side and European side of Istanbul. The project consists of 109 boreholes of depth upto 101 metres a total of 3900 metres drilling. Additional to boreholes also PS logging tests.