The Project covered the construction of two R.C. Bridges on the rivers of Euphrates and Tohma.
The project involved the construction of the 287 m. long Komurhan highway bridge across the euphrates river between Malatya and Elazığ.
Kinali-Edirne Motorway, Structure Construction Sub-contract
Construction of all viaducts (13 Nos), bridge across rivers (21 Nos), overpasses (60 Nos) and underpasses (11 Nos) on the Kınalı-Edirne Motorway.
Yeşilçay System ömerli
The scope covers the manufacturing of 20 nos of Ø1750mm diameter piles with depths up to 47 metres. The length of the aqueduct is 225.4 m with a width of 12.5 m, consisting of 9 axis having a distance of 25 m between two axis (piers).
Yeşilçay System Darlik Pipeline Aqueduct Construction, Istanbul
The scope covers the construction of 12 nos of Ø1750mm diameter piles with pile lengths up to 36 metres. The length of the aqueduct is 125 m with a width of 12.5 m, consisting of 6 axis having a distance of 25 m between two axis (piers).
Construction Of New Galata Bridge and Re-arrangement Of Eminönü and Karaköy Squares at Golden Horn
The project covered the construction of a 490 m. Long and 42 m. Wide bridge supported by tubular steel piles. The project also covered the rearrangement of Eminonü and Karaköy squares at each end of the bridge.
Construction of Substructures and Caissons of Izmit Bay Suspension Bridge
The project covers; 2×55000 t Caissons as Tower Foundations to be placed to a depth of -40m on seabed including dredging, driving of 390 no’s of Inclusion Piles and Bedding works, Construction of Dry Dock and Wet Dock for Caisson Production, Diaphragm Wall Construction at South Anchorage Area, Anchorage Structures positioned on both side of the Bridge, Approach Bridges Piers and Side Spans Piers for both North and South Site, Reclamation & Revetment works for the South Anchorage Area.
Click to watch video.
Caissons for the İzmit Bay Crossing Project