Final Acceptance Letter has been received on 31.10.2016 for Taqah Fishery Harbour Project, which was undertaken by the contract signed on 31.03.2013.
Project covers the construction of breakwaters, berth, reclamation, and desing and built of Pantoons. Besides, the Construction of link road to connect Salalah – Mirbat main road to port and internal service roads will be done under the scope of the Contract.