The final acceptance letter has been received on 25.08.2022 for the “Emergency Outfall for Salalah Wastewater System” Project, which was undertaken as STFA İnşaat by the contract signed on 15.07.2015 with the Salalah Sanitary Drainage Services Co. (S.S.D.C).