Projects in Qatar with Berth 6

STFA Deniz İnşaat Continues its Projects in Qatar with Berth 6

STFA Deniz İnşaatı İnşaat San ve Tic. A.Ş has signed a contract with Fluor Mideast Limited for Common Lean LNG Loading Facilities Berth No: 6 in Ras Laffan, Qatar on 02 November 2007

Qatargas Operating Company Limited is developing an integrated lean LNG storage and loading facility at Ras Laffan Industrial City located on the northeast coast of Qatar.

Phase 6 of this project consists of adding a new dock facility for loading lean LNG from LNG tanks. Phase 6 specifically includes:

A 580 m long LNG Berth 6 Abutment and Tie-in to New Main Breakwater

LNG Loading Platform Block Foundation, with Cast Reinforced Concrete (CRC) cap.

Four (4) Breasting Dolphins on Block Foundations with CRC caps equipped with fenders and quick release hooks (double) with capstan.

Eight (8) Mooring Dolphins on Block Foundations with CRC caps equipped with quick release hooks (quadruple) with capstan.

Catwalks, platforms and ladders

Berth 6 Marine Flare Piled Support Platform Structure.

Installation of Loading Platform and Breasting Dolphin fenders

Installation of Quick Release Hooks

The value of the project is 144,870,831 USD and the period for completion of the Works will be 16 months.

Souk Al Ahad

STFA Continues its Housing Projects in Libya with Souk Al Ahad 2000 Housing Units Project

STFA Construction Company has signed a contract with Organization for Development of Administrative Centers (ODAC) in Libya for Souk Al Ahad 2000 Housing Units Project. The bidding of the project was in May 2007. The project value is 256.953.000 USD and has a construction period of 24 months.

The project is located at the Souk Al Ahad Region near Tripoli and comprises of Design, Engineering, Procurement and Construction Works of 2000 villas. 1000 of these villas will be single storey and the remaining 1000 will be double storey. The signed part of the project covers only the construction of the villas. With the additional works consisting of gardens and fences, roads, infrastructure works, wastewater treatment plant and landscaping, the whole project is expected to be worth a total sum of 400 Million USD approximately.

Küçüksu Wastewater Pretreatment

STFA received Final Completion Certificate for Küçüksu Wastewater Pretreatment Plant and Sea Outfall Project

Küçüksu Wastewater Pretreatment Plant and Sea Outfall Project, which has been awarded on 10 May 2001 by a contract signed between Istanbul Water and Sewerage Administration (ISKI) and STFA Marine Construction Co. – STFA Infrastructure & Tunnel Construction Contracting Industry and Trade Co. Joint Venture, was handed over to the Client after receiving the Final Complition Certificate on 30 April 2007. The project was completed in 2006 and Temporary Completion Certificate was signed on 15 May 2006.

The project scope covered the  construction of 1035 m. long Küçüksu Tunnel and also the construction of Küçükçekmece Sea Outfall works additional to the Küçüksu Wastewater Pretreatment Plant and Sea Outfall Civil Works. With the additional works, the value of the project reached 21 Million USD.

Duqm Port project

STFA has signed a contract for Duqm Port project in Oman

d(STFA – CCC J.V.) – JDN NV Consorsium has signed a contract on 04.April.2007 with Ministry of Transport and Communications for Construction of a New Port at Duqm project in Oman.

The project with a value of 484,050,280 US Dollars covers the construction of 2811m and 2738 m long breakwaters, 700 m long commercial quay wall of concrete blocks with 16m depth designed for containers, general cargo and drydock bulk vessels, 330 m long quay wall of concrete blocks with 8 m depth designed for navy and coast guard vessels, a small craft berth for tugs and pilot boats and also 31,000,000 cum of dredging and reclamation works.

Northern Jeddah Drainage Channel Culvert Project

STFA has signed a contract for Northern Jeddah Drainage Channel Culvert Project in Saudi Arabia

STFA Construction Co. In JV with ALWAN has signed a contract with Municipality of Jeddah in Saudi Arabia for the Northern Jeddah Drainage Channel Culvert Project which had been tendered on 11 December 2006.

The Project, consisting from 3 packages has a total value of 85.275.959 USD. The first package covers 2194 m. length (3,25 m x 2,95 m)  box culverts with 6 cells. The second package covers 6055 m. length ( 3,25 m. X 2,90 m. – 3,25 m. X 4 m. ) box culverts with 2 and 3 cells. And the third package covers 7095 m. Length ( 3,25 m. X 2,95 m. ) box culverts with 3 cells.

Manifa Causeway

STFA is to take part in Manifa Causeway

Jan De Nul NV had applied for the tender of Saudi Aramco’s Manifa Oil Field Redevelopment (Engineering, Procurement and Fabrication of Manifa Causeway) Project together with STFA Marine Construction Company on 28.November.2006.  The value of the tender was 1,005,000,000 US Dollars and with this price Jan De Nul NV has been awarded the project and signed a contract with Aramco on 4.February.2006.

The aim of the project is to construct 27 drilling islands at Persian Gulf, Manifa Region and to link these islands to each other and also to the land by a causeway consisting of roads, bridges and culverts in order to transfer the oil that shall be drilled from the islands by a pipeline.

Following the contract signature with Saudi Aramco, Jan De Nul NV has signed an EPC back to back contract with STFA Marine Construction Company for a value of 202,500,000 US Dollars at STFA Business Center in Istanbul on 2.March.2007.

The contract of STFA covers the design and construction of pavement and infrastructure works of 41km causeway, north and south berths and also ro-ro facility. The main work items of the causeway are the construction of a main bridge with 2.4km length, 5 nos of bridges each having 180m length and construction of 8 nos of precast culverts consisting of 250 nos of 5mx3mx3m segments.

Artell Koytür BUYAKA Projects

STFA has received the Temporary Completion Certificate for the 1st and 2 nd Phase of the Artell Koytür BUYAKA Projects Building Pit Construction.

For the shoring works of The Artell Koytür Çekmeköy Residence’s Phase 1 and Phase 2 Foundation Pits, STFA has received The Temporary Completion Certificate on 1 March 2007. The contract was signed on 15 June 2006 between STFA Temel Pile Construction Co. And Artell Koytür Tourism Construction Industry and Trade Co.

The project scope also covered the soil improvement works of the foundations for 3 towers with 28 storeys. Design process continues in guidance of the accomplished soil investigations.