DP World’s Yarimca Container Terminal is planning to receive the 1st commercial vessel on 23th June 2015 by which the official opening will also take place. In this respect, 4 ship to shore cranes to be operated on main berth and 8 rubber tired gantry cranes to be operated at yard area have arrived to Yarimca in May 2015. As the recent technology terminal operating systems will be implemented in Yarimca, all cranes (either quay or yard) are planned to be operated from a central control room with a remote control.