A total of 7 boreholes with designated numbers BHP1 through BHP7 were drilled to depths between 10.0 and 25.0m at investigated site for preliminary investigations.
A total of 74 boreholes with designated numbers BH01 through BH95 were drilled to depths between 7.0 and 10.45 m at investigated site for detailed investigations.