<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>TURKEY &#8211; STFA Construction Group</title>
	<atom:link href="https://construction.stfa.com/portfolio_tag/turkey/feed/" rel="self" type="application/rss+xml" />
	<link>https://construction.stfa.com</link>
	<description>We Know How</description>
	<lastBuildDate>Mon, 13 Mar 2023 07:52:58 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	
	<item>
		<title>In Iskenderun  Assanport Off Dock-1 Container Termial Project</title>
		<link>https://construction.stfa.com/project/in-iskenderun-assanport-off-dock-1-container-termial-project/</link>
		
		<dc:creator><![CDATA[Ferdi Tiyek]]></dc:creator>
		<pubDate>Mon, 07 Mar 2022 17:23:59 +0000</pubDate>
				<guid isPermaLink="false">https://construction.stfa.com/?post_type=portfolio&#038;p=6548</guid>

					<description><![CDATA[]]></description>
										<content:encoded><![CDATA[
<div id="wpc_6a267dfe29414" class="vc_row wpb_row vc_row-fluid  ">
		<div class="row_inner_wrapper  clearfix">
			<div class="row_inner row_center_content clearfix"><div class="wpb_column vc_column_container vc_col-sm-12"><div class="vc_column-inner"><div class="wpb_wrapper">
	<div class="wpb_text_column wpb_content_element " >
		<div class="wpb_wrapper">
			<p>Assanport Off Dock-1 Container Terminal project proceeds as planned.</p>

		</div>
	</div>
</div></div></div>
			</div>
		</div>
</div>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Izmir Light Rail Transport System Phase II Project</title>
		<link>https://construction.stfa.com/project/izmir-light-rail-transport-system-phase-ii-project/</link>
		
		<dc:creator><![CDATA[Ferdi Tiyek]]></dc:creator>
		<pubDate>Wed, 27 Feb 2019 23:00:43 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=3395</guid>

					<description><![CDATA[Izmir Light Rail Transport System Phase II Project; Project Management and Supervision Services]]></description>
										<content:encoded><![CDATA[<p>Izmir Light Rail Transport System Phase II Project; Project Management and Supervision Services</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Kuyumcukent Workshop and Office Buildings</title>
		<link>https://construction.stfa.com/project/kuyumcukent-workshop-and-office-buildings/</link>
		
		<dc:creator><![CDATA[Ferdi Tiyek]]></dc:creator>
		<pubDate>Wed, 27 Feb 2019 22:56:25 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=3391</guid>

					<description><![CDATA[Kuyumcukent Workshop and Office Buildings; Project Management, Supervision and Tender Consultancy Services]]></description>
										<content:encoded><![CDATA[<p>Kuyumcukent Workshop and Office Buildings; Project Management, Supervision and Tender Consultancy Services</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Mersin International Port Projects</title>
		<link>https://construction.stfa.com/project/mersin-international-port-projects/</link>
		
		<dc:creator><![CDATA[Ferdi Tiyek]]></dc:creator>
		<pubDate>Wed, 27 Feb 2019 21:59:45 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=3367</guid>

					<description><![CDATA[]]></description>
										<content:encoded><![CDATA[
<div id="wpc_6a267dfe2d23a" class="vc_row wpb_row vc_row-fluid  ">
		<div class="row_inner_wrapper  clearfix">
			<div class="row_inner row_center_content clearfix"><div class="wpb_column vc_column_container vc_col-sm-12"><div class="vc_column-inner"><div class="wpb_wrapper">
	<div class="wpb_text_column wpb_content_element " >
		<div class="wpb_wrapper">
			<p>Project Management, Supervision and Engineering Services including Design, Design Review, Tender Consultancy, Repair and Refurbishment Engineering</p>

		</div>
	</div>
</div></div></div>
			</div>
		</div>
</div>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>DP World Yarimca Container Terminal Project</title>
		<link>https://construction.stfa.com/project/dp-world-yarimca-container-terminal-project/</link>
		
		<dc:creator><![CDATA[Ferdi Tiyek]]></dc:creator>
		<pubDate>Thu, 10 Dec 2015 14:29:28 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=4180</guid>

					<description><![CDATA[]]></description>
										<content:encoded><![CDATA[
<div id="wpc_6a267dfe2e219" class="vc_row wpb_row vc_row-fluid  ">
		<div class="row_inner_wrapper  clearfix">
			<div class="row_inner row_center_content clearfix"><div class="wpb_column vc_column_container vc_col-sm-12"><div class="vc_column-inner"><div class="wpb_wrapper">
	<div class="wpb_text_column wpb_content_element " >
		<div class="wpb_wrapper">
			<p>In the scope of DP World Yarımca Container Terminal project below listed works are completed<br />
successfully, Geotechnical Design of project is prepared and approvals are received From Consultant and IDV ,Trial JG Designs are carried out and JG parameters are selected , A total 14 954 nos JG columns are constructed with a total of 261.314 m Jet Grouting , Performance Load tests on Single Columns are carried out ,Multi Column Load tests are carried out on selected group of Columns, Visual checks , Rotary corings and UCS tests arecarried out at selected columns, PIT tests are executed on selected columns ,CPT tests are carried at selected zones.</p>

		</div>
	</div>
</div></div></div>
			</div>
		</div>
</div>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Aegean Refinery Project</title>
		<link>https://construction.stfa.com/project/aegean-refinery-project/</link>
		
		<dc:creator><![CDATA[Ferdi Tiyek]]></dc:creator>
		<pubDate>Sun, 14 Dec 2014 14:15:53 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=1812</guid>

					<description><![CDATA[TERRACE 1 &#8211; On the onshore part of the investigation site “Terrace 1”, 46 boreholes are drilled to max. 41.00 meters ...]]></description>
										<content:encoded><![CDATA[<p>TERRACE 1 &#8211; On the onshore part of the investigation site “Terrace 1”, 46 boreholes are drilled to max. 41.00 meters of depth. Furthermore, 5 nos pressuremeter tests, 8 nos permeability tests, 1 no seismic refraction, 1 no seismic reflection, 4 nos electric resistivity tests,laboratory tests are carried out and 2 nos casagrande type standpipe are installed for ground water monitoring.<br />
TERRACE 2 &#8211; On the onshore part of the investigation site “Terrace 2”, 102 boreholes are drilled to max. 40.50 meters of depth. Furthermore, 11 nos pressuremeter tests, 8 nos permeability tests, 1 nos water pressure tests, 8 nos seismic refraction, 4 nos seismic reflection, 11 nos seismic down-hole tests and 7 nos seismic cross-hole tests, 22 nos electric resistivity tests, laboratory tests are carried out and 4 nos Casagrande type standpipe piezometers are installed ground water monitoring.<br />
TERRACE 3 &#8211; On the onshore part of the investigation site “Terrace 3”, 60 boreholes are drilled to max. 41.00 meters of depth. Furthermore, 7 nos pressuremeter tests, 8 nos permeability tests, 3 nos seismic refraction, 3 nos seismic reflection, 4 nos seismic down-hole tests and 1 nos seismic cross-hole tests, 8 nos electric resistivity tests, 1 no thermal resistivity test , laboratory tests are carried out and 3 nos Casagrande type standpipe piezometers are installed ground water monitoring.<br />
TERRACE 4 &#8211; On the onshore part of the investigation site “Terrace 4”, 113 boreholes are drilled to max. 40.00 meters of depth. Furthermore, 8 nos pressuremeter tests, 12 nos permeability tests, 6 nos seismic refraction, 3 nos seismic reflection, 7 nos seismic down-hole tests and 3 nos seismic cross-hole tests, 22 nos electric resistivity tests, 1 no thermal resistivity tests, laboratory tests are carried out and 6 nos casagrande type stand-pipe piezometers are installed for ground<br />
water monitoring.<br />
TERRACE 5 &#8211; On the onshore part of the investigation site “Terrace 5”, 70 boreholes are drilled to max. 60.00 meters of depth. Furthermore, 5 nos pressuremeter tests, 6 nos permeability tests, 10 nos seismic refraction, 4 nos seismic reflection, 1 no seismic down-hole tests and 1 no seismic cross-hole tests, 16 nos electric resistivity tests, laboratory tests are carried out and 3 nos casagrande type standpipe piezometers are installed for ground water monitoring.<br />
TERRACE 6 &#8211; On the onshore part of the investigation site “Terrace 6”, 38 boreholes are drilled to max. 50.00 meters of depth. Furthermore, 4 nos pressuremeter tests, 7 nos permeability tests, 7 nos seismic refraction, 4 nos seismic reflection, 2 nos seismic down-hole tests, 5 nos electric resistivity tests and laboratory tests are carried out and 1 no casagrande type standpipe are installed for ground water monitoring<br />
OFFSHORE &#8211; On the Off shore part of the investigation, 35 boreholes are drilled to<br />
max. 83.50 meters of depth and laboratory tests are executed on<br />
suitable samples.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>PS Yard Yarımca Container Terminal Project</title>
		<link>https://construction.stfa.com/project/ps-yard-yarimca-container-terminal-project/</link>
		
		<dc:creator><![CDATA[Ferdi Tiyek]]></dc:creator>
		<pubDate>Sat, 13 Dec 2014 13:17:13 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=1721</guid>

					<description><![CDATA[Accordingly the scope of the soil investigation, the fieldwork covers drilling a total of 27 nos. on shore boreholes for PS ...]]></description>
										<content:encoded><![CDATA[<p>Accordingly the scope of the soil investigation, the fieldwork covers drilling a total of 27 nos. on shore boreholes for PS Yard Yarımca Container Project, with core or soil recovery, sampling, carriying out of in-situ test in borehole like Standart Penetration Test (SPT), and performs laboratory tests and preparation of geotechnical report.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Yarimca Container Terminal, Civil Works Contract</title>
		<link>https://construction.stfa.com/project/yarimca-container-terminal-civil-works-contract/</link>
		
		<dc:creator><![CDATA[Ferdi Tiyek]]></dc:creator>
		<pubDate>Sat, 25 Oct 2014 04:43:52 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=1512</guid>

					<description><![CDATA[]]></description>
										<content:encoded><![CDATA[
<div id="wpc_6a267dfe31b78" class="vc_row wpb_row vc_row-fluid  ">
		<div class="row_inner_wrapper  clearfix">
			<div class="row_inner row_center_content clearfix"><div class="wpb_column vc_column_container vc_col-sm-12"><div class="vc_column-inner"><div class="wpb_wrapper">
	<div class="wpb_text_column wpb_content_element " >
		<div class="wpb_wrapper">
			<p>The project consists of the marine construction works on Yarımca Container Terminal</p>
<p><strong>Click to watch video.</strong></p>
<blockquote class="wp-embedded-content" data-secret="kJp2U2ZF0v"><p>
<a href="https://construction.stfa.com/yarimca-container-terminal-2/">Yarımca Container Terminal</a>
</p></blockquote>
<p><iframe class="wp-embedded-content" sandbox="allow-scripts" security="restricted"  title="&#8220;Yarımca Container Terminal&#8221; &#8212; STFA Construction Group" src="https://construction.stfa.com/yarimca-container-terminal-2/embed/#?secret=lhhMyVYaRG#?secret=kJp2U2ZF0v" data-secret="kJp2U2ZF0v" width="600" height="338" frameborder="0" marginwidth="0" marginheight="0" scrolling="no"></iframe></p>

		</div>
	</div>
</div></div></div>
			</div>
		</div>
</div>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Rehabilitation Of Quay And Construction Of New Jetty At Zone B Of Tupras Izmit Refinery</title>
		<link>https://construction.stfa.com/project/rehabilitation-of-quay-and-construction-of-new-jetty-at-zone-b-of-tupras-izmit-refinery/</link>
		
		<dc:creator><![CDATA[Ferdi Tiyek]]></dc:creator>
		<pubDate>Sat, 25 Oct 2014 07:28:50 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=1505</guid>

					<description><![CDATA[Quay Rehabilitation, Jetty Construction, Buildings, Electrical Works, Mechanical Works, Instrumentation Works, Demolition of existing jetty and buildings]]></description>
										<content:encoded><![CDATA[<p>Quay Rehabilitation, Jetty Construction, Buildings, Electrical Works, Mechanical Works, Instrumentation Works, Demolition of existing jetty and buildings</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>The Study on a Disaster Prevention/mitigation Basic Plan in Istanbul Including Seimic Microzonation Geotechnical &#038; Geophysical Factual Report</title>
		<link>https://construction.stfa.com/project/the-study-on-a-disaster-preventionmitigation-basic-plan-in-istanbul-including-seimic-microzonation-geotechnical-geophysical-factual-report/</link>
		
		<dc:creator><![CDATA[stfaconst]]></dc:creator>
		<pubDate>Sun, 01 Jun 2014 11:59:45 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=713</guid>

					<description><![CDATA[Geotechnical &#038; geophysical investigations have been carried out in both the European and Anatolian sides of İstanbul. The field work of ...]]></description>
										<content:encoded><![CDATA[<p>Geotechnical &#038; geophysical investigations have been carried out in both the European and Anatolian sides of İstanbul. The field work of the investigation includes drilling of 48 boreholes, execution of 40 microtremor and  39 PS Logging measurements.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
